811 Call Before You Dig: How Locate Requirements Vary by State

Picture a crew that finishes a fiber trench in Utah on Friday and starts a gas service line in Nevada on Monday. The team follows the same “811 call before you dig” routine it always does, yet the job is already out of compliance.

The notice window is different, and the 811 ticket expires on a different clock. For project owners who hire multi-state contractors, those gaps quickly turn into costly delays and damaged lines.

This guide explains what changes at the state line, compares several Western states, and shows how to plan excavation, so every crew stays compliant. 

Keep reading to learn everything you need to know about 811 call before you dig.

What “811 call before you dig” means and why 811 laws differ by state

811 is the national number that connects anyone planning to dig with the one-call center in their state. That center notifies utility operators in the area, who send locators to mark buried gas, electric, water, and communications lines. The system is national, but the rules behind it are not.

Each state writes its own damage prevention law. That law determines how many days’ notice an excavator owes and how long a utility locate remains valid. It also sets the width of the tolerance zone and the penalty for digging without a ticket.

The Pipeline and Hazardous Materials Safety Administration (PHMSA) keeps a separate law summary for each state, such as its Colorado damage prevention law summary. That summary exists because 811 laws vary by state.

For project owners, the takeaway is simple. The duty to call 811 before you dig never changes, but the details that keep a job legal do.

Infographic titled "How the 811 Locate Process Works, Step by Step," displaying seven numbered panels with photos, icons, and text explaining safe digging procedures from outlining the area to renewing tickets.

How the 811 locate process works, step by step

The basic process looks alike from state to state. The timing at each step is what changes.

  1. Outline the dig area with white paint or flags where state law requires it.
  2. Submit an 811 ticket online or by phone with the address, dig area, and type of work.
  3. Wait out the full notice period set by your state before breaking ground.
  4. Check for an 811 positive response from every operator listed on the ticket.
  5. Confirm the marks on site match the 811 color codes for each utility.
  6. Use hand tools inside the tolerance zone around every mark.
  7. Renew the ticket before it expires, and request new marks if paint fades.

Where a state uses positive response, each operator confirms that it has marked its lines or has no facilities in the dig area. Starting before every response posts leaves the crew guessing about lines nobody has confirmed.

Why following state 811 rules protects crews, budgets, and communities

For project owners, calling before they dig is one of the clearest signs of how they run a job.

  • Worker safety: A struck gas or electric line puts everyone in the trench at risk.
  • Fewer outages: Accurate utility locate work keeps neighbors’ power, water, and internet running.
  • Lower costs: Avoiding a strike avoids repair bills, fines, and liability claims.
  • Steady schedules: Tickets requested on time keep crews from idling at the gate.
  • Protected assets: Gas mains and fiber lines stay intact for the owners who depend on them.
  • Municipal trust: Cities and utilities return to contractors with clean damage records.

Common 811 mistakes that lead to utility strikes

  • Digging on an expired 811 ticket because the job ran long. Set a renewal reminder several days before the ticket expires.
  • Assuming one state’s wait period applies across the border. Look up the notice period for each state before scheduling the first crew.
  • Skipping white-lining where the state requires it. White paint or flags show locators exactly where the dig will take place, keeping marks accurate.
  • Running machinery inside the tolerance zone instead of hand-digging. Switch to hand tools or vacuum excavation once work reaches the zone.
  • Starting before every operator posts an 811 positive response. Check the ticket status the morning of the dig, not the night before.
  • Treating faded or washed-out marks as still valid. Rain and snow wear paint away quickly, so request a remark when marks fade.
  • Working from memory of 811 laws instead of the current statute. States amend these laws, as Utah did in 2024, so check the one-call center’s current rules for every job.

811 and utility damage statistics

  • The Common Ground Alliance (CGA) recorded nearly 200,000 unique utility damages in 2024 in its Damage Information Reporting Tool (DIRT) report, according to Underground Infrastructure.
  • Failure to notify 811 before digging remains the top root cause of those damages, per the same report.

Tools and 811 color codes for managing tickets across states

  • State one-call centers: Blue Stakes of Utah; USA North 811 for Nevada; Arizona 811; Colorado 811; Digline for Idaho; Montana 811; South Dakota 811; and One Call of Wyoming each run their own ticket systems.
  • Compare States tool: The CGA’s Compare States page lines up state rules side by side.
  • Ticket lookup portals: Track 811 positive response status for each operator before crews mobilize.
  • Color code chart: Keep the American Public Works Association (APWA) uniform 811 color codes chart in every truck.
  • GPS-enabled locate records: Photos and coordinates of marks document what crews saw before digging.

The standard 811 color codes are:

  • Red for electric
  • Yellow for gas, oil, and steam
  • Orange for communications
  • Blue for potable water
  • Purple for reclaimed water
  • Green for sewer
  • Pink for temporary survey marks
  • White for the proposed dig area
Green numbers 811 visible through a torn hole in a bright green sheet of paper over a white background.

FAQ

How deep is it safe to dig before calling 811?

No depth is automatically safe. State damage prevention laws require a locate request for any digging, no matter how shallow. Many utilities sit only inches below the surface. 

How long is an 811 ticket good for?

It depends on the state. Check the expiration date on every 811 ticket and renew it before the deadline, not after crews arrive.

How far in advance do you need to call 811?

Notice rules in Utah, Nevada, Arizona, and Colorado generally fall between two and three business days. Nevada also caps notice at 28 calendar days before work begins. Because these windows shift with changes in law, confirm the current rule with the state one-call center before scheduling crews.

Does it cost anything to call 811?

No. Calling 811 or submitting a request online is free for homeowners and excavators. Member utilities support the one-call system and send locators to mark their own lines. Skipping the call is what gets expensive, through repairs, fines, outages, and injuries that a free 811 ticket helps prevent.

What is the tolerance zone around marked utilities?

The tolerance zone is the strip on each side of a utility mark where crews must dig with extra care, usually by hand. Its width varies by state. 

Does 811 mark private lines?

No. Utility operators mark their own lines, usually up to the meter or service connection. Lines past that point belong to the property owner, such as sprinkler systems or a gas line to a detached garage. To find them, hire a private utility locator before digging. Project owners should settle who handles private locates before work begins.

What should you do if you hit a utility line?

Stop digging right away and keep people clear of the area. If gas is leaking or a line is sparking, leave the site and call 911. Then notify the line’s operator and your state one-call center, even if the damage looks minor. A small nick in a gas line or cable coating may fail weeks later.

What if the marks aren’t there when the wait period ends?

Don’t dig. Check the ticket’s positive response status to see which operators have not responded, then contact the one-call center to follow up. Most states require excavators to wait until every operator marks its lines or confirms it has none in the area.

Digging across the Intermountain West

Jackson Infrastructure works in Arizona, Utah, Colorado, Idaho, Montana, Nevada, South Dakota, and Wyoming, and each state brings its own conditions. Winter frost and spring thaw fade paint and pull flags, which makes repairs a regular part of the season.

Rapid growth along the Wasatch Front keeps new subdivisions and service lines going in. Fiber buildouts in places like Colorado Springs, Colorado, and Bozeman, Montana, add fresh lines to crowded corridors.

Working as an infrastructure contractor in Utah and Nevada means planning for two sets of 811 laws, sometimes in the same week.

Plan compliant excavation across state lines with Jackson Infrastructure

Every state’s message to excavators is the same: call 811 before you dig. Notice periods, ticket life, tolerance zones, and positive response rules still change at the border. Project owners who understand those differences set realistic schedules and choose contractors who plan for them. 

Jackson Infrastructure builds 811 call before you dig requirements into every job, from the first ticket to final restoration. Contact Jackson Infrastructure to talk through your next utility or infrastructure project.